Managing the exploitation life of the mining machinery for an unlimited duration of time

Authors

  • Slobodan Vujić Faculty of Mining and Geology, Belgrade
  • Radoslav Stanojević
  • Vencislav Ivanov Mining and Geology University "St. Ivan Rilski", Sofia, Bulgaria
  • Borislav Zajić Faculty of Mining and Geology, Belgrade
  • Igor Miljanović Faculty of Mining and Geology, Belgrade
  • Svetomir Maksimović Electric Power Industry of Serbia, Belgrade
  • Stefko Boševski Rudproekt, Skopje, Macedonia
  • Tomo Benović Mine and Thermal Power Plant, Ugljevik
  • Marjan Hudej MCP Velenje, Velenje, Slovenia

DOI:

https://doi.org/10.2298/YJOR1101137V

Keywords:

Bucket wheel excavators, exploitation life of machinery, optimization, operations research, theory of replacement, dynamic programming

Abstract

The problem of determining the optimum exploitation life of machinery, namely, the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Taking into consideration the situation prevailing at coal pit mines in Serbia, the tasks of this rank are very complex and difficult. To make a decision on the replacement of capital equipment and machinery, such as bucket wheel excavators within the mentioned systems, implies a management task of utmost responsibility. It requires high professional and analytical knowledge as well as reliable arguments, based on a multidisciplinary professional approach. In this paper, the authors present their views on the problem of establishing the optimum exploitation life of bucket wheel excavators, offering an algorithm, based on dynamic programming, as a solution.

References

Vujić, S., et.al., “The study on establishing the exploitation life of capital mining equipment at coal open pit mines of the electric power industry of Serbia,” FMG Belgrade, Belgrade (138) 2002. (In Serbian)

Vujić, S., “Determination of optimum time for machinery replacement at open pit mines,” Proceedings of the First Yugoslav Symposium on Equipment Maintenance at Mines, Volume II, Zenica 1977. (In Serbian)

Vujić, S., “Planning of optimum exploitation time of machinery at mines,” Proceedings of the Meeting on Maintenance of Equipment and Mechanization at Mines, GOSA - Smederevska Palanka 1977. (In Serbian)

Tanasković, T., et al., “A proposal for determination of exploitation life of excavators by a modified model of replacement,” SYM-OP-IS 2000, Belgrade 2000. (In Serbian)

Živojinović, R., “Mathematical-modelling approach to determination of the optimum exploitation life of equipment at mines,” Doctoral Thesis, Faculty of Mining and Geology University of Belgrade, Belgrade, 2002. (In Serbian)