Continuous review inventory models under time value of money and crashable lead time consideration
DOI:
https://doi.org/10.2298/YJOR1102293HKeywords:
inventory model, crashable lead time, time value of moneyAbstract
A stock is an asset if it can react to economic and seasonal influences in the management of the current assets. The financial manager must calculate the input of funds to the stock intelligently and the amount of money cycled through stocks, taking into account the time factors in the future. The purpose of this paper is to propose an inventory model considering issues of crash cost and current value. The sensitivity analysis of each parameter, in this research, differs from the traditional approach. We utilize a course of deduction with sound mathematics to develop several lemmas and one theorem to estimate optimal solutions. This study first tries to find the optimal order quantity at all lengths of lead time with components crashed at their minimum duration. Second, a simple method to locate the optimal solution unlike traditional sensitivity analysis is developed. Finally, some numerical examples are given to illustrate all lemmas and the theorem in the solution algorithm.References
Balkhi, Z.T., “An optimal solution of a general lot size inventory model with deteriorated and imperfect products, taking into account inflation and time value of money”, International Journal of Systems Science, 35 (2004) 87-96.
Bose, S., Goswami, A., and Chaudhuri, K.S., “An EOQ model for deteriorating items with linear time-dependent demand and shortages under inflation and time discounting”, Journal of the Operational Research Society, 46 (1995) 771-782.
Chung, K.J., and Tsai, S.F., “Inventory systems for deteriorating items with shortages and a linear trend in demand-taking account of time value”, Computer & Operational Research, 28 (2001) 915-934.
Das, D., Kar, M.B., Roy, A., and Kar, S., “Two-warehouse production model for deteriorating inventory items with stock-dependent demand under inflation over a random planning horizon”, Central European Journal of Operations Research, Online 10 October 2010, pp. 1-30.
Dey, J.K., Mondal, S.K., and Maiti, M., “Two storage inventory problem with dynamic demand and interval valued lead-time over finite time horizon under inflation and time-value of money”, European Journal of Operational Research, 185 (1) (2008) 170-194.
Hariga, M., “Effects of inflation and time value of money on time-dependent demand rate and shortages”, European Journal of Operational Research, 81 (1995) 512-520.
Hou, K.L., Huang, Y.F., and Lin, L.C., “An inventory model for deteriorating items with stock-dependent selling rate and partial backlogging under inflation”, African Journal of Business Management, 5 (10) (2011) 3834-3843.
Jaggi, C.K., and Aggarwal, S.P., “Credit financing in economic ordering policies of deteriorating item”, International Journal of Production Economics, 34 (1994) 151-155.
Ji, L.Q., “Research on inventory model for non-instantaneous deteriorating items taking into account time value of money”, International Conference on Internet Technology and Applications, ITAP 2010 - Proceedings, 2010.
Kumar Maiti, M., “A fuzzy genetic algorithm with varying population size to solve an inventory model with credit-linked promotional demand in an imprecise planning horizon”, European Journal of Operational Research, 213 (1) (2011) 96-106.
Moon, I., Giri, B.C., and Ko, B., “Economic order quantity models for ameliorating deteriorating items under inflation and time discounting”, European Journal of Operational Research, 162 (3) (2005) 773-785.
Moon, I., and Lee, S., “The effects of inflation and time-value of money on an economic order quantity model with a random product life cycle”, European Journal of Operational Research, 125 (2001) 588-601.
Moon, I., and Yun, W., “A note on evaluating investments in inventory systems: A net present value framework”, The Engineering Economist, 39 (1) (1993) 93-99.
Moon, I., and Yun, W., “An economic order quantity model with a random planning horizon”, The Engineering Economist, 39 (1) (1993) 77-86.
Ouyang, L.Y., Yeh, N.C., and Wu, K.S., “Mixture inventory models with backorders and lost sales for variable lead time”, Journal of the Operational Research Society, 47 (1996) 829-832.
Rachamadugu, R., “Error bounds for EOQ”, Naval Research Logistics, 35 (1988) 419-425.
Shah, N.H., “Inventory model for deteriorating items and time value of money for a finite time horizon under the permissible delay in payments”, International Journal of Systems Science, 37 (1) (2006) 9-15.
Silver, E.A., and Peterson, R., Decision Systems for Inventory Management and Production Planning, John Wiley, New York, 1985.
Sun, D.N., and Queyranne, M., “Production and inventory model using net present value”, Operations Research, 50 (2002) 528-537.
Wee, H.M., and Law, S.T., “Replenishment and pricing policy for deteriorating items taking into account the time-value of money”, International Journal of Production Economics, 71 (2001) 213-220.
Wee, H.M., Lo, S.T., Yu, J., and Chen, H.C., “An inventory model for ameliorating and deteriorating items taking account of time value of money and finite planning horizon”, International Journal of Systems Science, 39 (8) (2008) 801-807.
Downloads
Published
Issue
Section
License
Copyright (c) 2011 YUJOR
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.