[1]
Stanimirović, I. et al. 2009. Heuristic algorithm for single resource constrained project scheduling problem based on the dynamic programming. Yugoslav Journal of Operations Research. 19, 2 (Sep. 2009), 281–298. DOI:https://doi.org/10.2298/YJOR0902281S.