1.
Almathkour F, Belgacem O, Toumi S, Jarboui B. Branch and bound algorithm for solving the total weighted tardiness criterion for the permutation flowshop scheduling problem with time lags. YUJOR [Internet]. 2022 Feb. 1 [cited 2025 Aug. 26];32(1):45-59. Available from: https://yujor.erc.fon.bg.ac.rs/index.php/yujor/article/view/687